Basic Info.
Model NO. | HGCF2022 |
Material | Metal, Metal |
Application | Metal Recycling Machine, Metal Cutting Machine, Metal Straightening Machinery, Metal Spinning Machinery, Metal Processing Machinery Parts, Metal forging Machinery, Metal Engraving Machinery, Metal Drawing Machinery, Metal Coating Machinery, Metal Casting Machinery, Metal Recycling Machine, Metal Cutting Machine, Metal Straightening Machinery, Metal Spinning Machinery, Metal Processing Machinery Parts, Metal Forging Machinery, Metal Engraving Machinery, Metal Drawing Machinery, Metal Coating Machinery, Machinery Parts |
Machining | CNC Machining |
Surface Preparation | Polishing |
Die Casting Method | Soluble Die Casting |
Die Casting Machine Type | Cold Chamber Die Casting Machine |
Casting Surface Quality Level | 2 |
Drawing Format | .Pdf/.Dwg/.Igs./.STP/.Prt/.Drw |
Tolerance Grade | 6 |
Pressure Chamber Structure | Vertical |
After-Sales Service | Free Replacement |
Transport Package | Wooden Box |
Specification | Basing on customer′s drawings |
Trademark | OEM |
Origin | China |
HS Code | 7616999000 |
Production Capacity | 50000 |
Product Description
HEADLINE | Fish Plate with Tower Crane Spare Parts |
PART NAME | Core shell |
PART NUMBER | HGCF2022 / OEM, basing on customer's drawings |
MATERIAL | Brass/ Zinc Alloy, Stainless Steel, Aluminum Alloy, /Magnesium Iron/ Cast Aluminium, Die Steel |
FEATURES | Finish: Zinc plating, Anodization, Chemical fim, Powder, Passivation, Sand blasting, Brushing & ploshing etc or as your requirementsInspection: Complete inspection lab with Micrometer, Optical Comparator, Caliper Vernier, Depth Caliper Vernier, Universal Protractor, Clock Gauge, Internal Centigrade GaugeDrawing format: .pdf/.dwg/.igs./.stp/.prt/.drw etc.1. All parts are inspected and tested with 100% passed in production.2. All products appearance are inspected and picked out those defective samples.3. The goods packages passed the impact and drop tests, they are fixed well in box. |
PRODUCT APPLICATION | Verhical parts, hardward parts. (Basing on customer's drawings) |
MANUFACTURING PROCESS | Forged, CNC, Surface finish, Painting. |
MOQ | 1 Set (It is able to provide a few samples first time) |
PACKAGE | Original/Genuine Package. |
PAYMENT TERM | Eco-packaging: EPE Foam, Carton, Wooden boxes, and other tailor-made packing per customer's requirement |
DELIEVERY TIME | 20 days moulds making, 10 days sample making, 7 days for stock, 30-40 days for production order. |
TRANSPORTATION | DHL/FEDEX/UPS/TNT/ARAMEX, AIR & SEA |
You may also like
Send inquiry
Send now